§ 42-80. Effect upon outstanding floodplain development permits.
Latest version.
Nothing herein contained shall require any change in the plans, construction, size,
or designated use of any development or any part thereof for which a floodplain development
permit has been granted by the floodplain administrator or his authorized agents before
the time of passage of this article; provided, however, that when construction is
not begun under such outstanding permit within a period of six months subsequent to
the date of issuance of the outstanding permit, construction or use shall be in conformity
with the provisions of this article.
(Code 1999, § 42-162; Ord. of 12-18-2006, § 1(art. VI(B))
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');